Independent supply partner · China

Diamond micron powder / grinding paste

sales@xtdiamond.com

Record 03 / Diamond micron powder

Specification record · values confirmed at quotation

Diamond micron powder

Powder specified by the finish you need.

Dry diamond material for lapping, polishing and processes where you control the suspension. We match the grade band to the surface result you measure, then confirm the details against the partner factory’s current datasheet.

01 / Grade bands

Four bands to frame the request.

The band narrows the range; the datasheet closes it. Select a band to see what it is used for and what we need to quote it.

What it is for

Final finishing and fine lapping, where the surface result is the constraint and a finer grade is worth the slower cut.

What to send

The substrate, the finish you measure, the machine or process, and any current grade or datasheet you already use.

Documentation focus

The grade band, the characterisation method stated on the datasheet, and the batch record available from the partner factory.

Note 01

Band labels are illustrative designators used to frame the conversation. They do not state particle-size values. The partner factory’s designation system, tolerances and measured values are confirmed at quotation.

02 / What to match

Five things decide the grade.

The same powder can suit one step and miss another. These are the inputs that move the recommendation.

01

Target surface finish

The result you measure, and the method you use to measure it. A finish target stated in your own terms is more useful than a general description.

02

Material and substrate

Carbide, steel, technical ceramic, glass or another material. Hardness and brittleness change how the powder behaves at the interface.

03

Process step

Stock removal, intermediate lapping or final polishing. The grade has to fit the step before it as well as the result you want.

04

Carrier and compatibility

What the powder will be dispersed in, and how the part is cleaned afterwards. Compatibility is confirmed before a sample is proposed.

05

Documentation needs

The datasheet fields, batch records or third-party inspection you require. Naming them early changes what we ask the partner factory to provide.

03 / Spec fields

Where the numbers actually come from.

This is the map of each field: what it means, and which document confirms it. None of these values are stated on this website.

Specification fieldsSource: partner datasheet
Diamond micron powder specification fields
FieldHow it is confirmed
Grade bandSelected by band and confirmed against the partner factory’s designation system. The exact designation appears on the quotation.
Particle-size characterisationThe method is stated on the partner factory’s current datasheet. Measured values are provided per batch where the partner makes them available.
Chemistry & purityStated on the partner factory’s current datasheet. Xintai does not test in-house and does not publish unverified values.
Surface conditionConfirmed against the datasheet and, where relevant, the sample evaluation you carry out on your own process.
PackagingSpecified per order and destination. Inner packaging, labelling and shipping marks are agreed before dispatch.
DocumentationThe batch document set is coordinated with the manufacturing partner. Third-party inspection can be coordinated when required.

02 No numeric particle-size, purity or tolerance figures appear on this page because they depend on the selected grade and partner factory. They are confirmed at quotation.

04 / Quality check

What we can check together.

Four practical steps between the first brief and a shipment. Each one is coordination, not a certification claim.

✓

Sample evaluation

A sample can be coordinated through the partner factory so the powder can be tested in your own suspension and process.

✓

Datasheet review

We review the partner factory’s current datasheet with you before quoting, including the characterisation method it states.

✓

Batch documentation

The document set available for the batch is coordinated and confirmed before dispatch, not after the invoice.

✓

Third-party inspection

Where you require independent verification, inspection can be coordinated. The scope, laboratory and cost are agreed first.

03 Coordination only. Xintai does not manufacture the material, operate an in-house laboratory or issue its own test certificates.

See also

Comparing powder with a prepared compound? Read the comparison →

Next step

Send the finish target. We’ll match the band.

Application, substrate, process step, the finish you measure and the destination are enough to start. If you have a current grade or datasheet, include it.